Warehouse Construction

Value of Project:

3 – 5 million

Scope of works:

  • Preparation of contract documents (Architects drawings, structural drawing and calculations,specifications, scope of works )

  • Pre-construction activities

  • Clearing, site investigation and construction of temporary structures

  • Concreting of substructure and superstructure (as per design mix)

  • Preparations of prefabricated steel structures

  • Erection of main steel structure and installation of other support elements

  • Installation of roof panels,wall panels,doors, windows,glass

  • Installation of Fire fighting system, Electric lightning and plumbing systems and HVAC system