Value of Project:

33 – 40 million

Scope of works:

  •  Preparation of contract documents (architects drawings, structural drawing and calculations,specifications, scope of works )

  • Pre construction activities

  • Clearing, site investigation and construction of temporary structures

  • Concreting of substructure and superstructure (as per design mix)

  • Supply and construct all structures from start to finish as agreed in the contract and specifications-ie;

  • Supply and construct all fixtures,glass,frames,doors,false ceiling and air conditioning units

  • Installation of railings (balluster) and water proofing on specified area

  • Installation of fire alarm, smoke detector and informative signages

  • Installation of space frame and roofings according to agreed design and specification